Our adventures in the Turkish Republic of Northern Cyprus continue....

Another site visit, this time to meet with the electrician to agree positioning of power points, wall switches, in the top house and under the covered veranda and utility areas. He is going to put switches upstairs in the dinning room to control the pool and garden lights, now that's really posh and lazy. He is also going to put the strengthening pieces in the upstairs ceilings to take fan/light fittings. We put two in the container to go in the lounge, but if the fittings are in all the rooms we can always possibly use them. Now is the time and the most cost effective way to have extra points fitted, once the walls are plastered etc. then it is a little late.
|
|